← ALL PROJECTS

McCracken County BoE – Heath Elementary School

Kentucky
OVERVIEW

Tigress Construction Group delivered the glass and aluminium scope on this project as a single accountable package — shop drawings, procurement, coordination and installation run as one system rather than handed between stages. Interfaces with the structure and the adjacent trades were settled on paper before material was released, so the work reached the wall without the rework that is normally absorbed downstream.

CLIENT
tiger
TYPE
Institutions
ARCHITECT
Ross Tarrant Architects
LOCATION
Kentucky
PROJECT FEATURES
Aluminum Storefronts Non Thermal Doors Vents
PROJECT SIZE
23,000
RELATED

Adjacent work

  • 24th and Rio Grande Apartments

    Rhode Partner INC Texas
  • Bowling Green HS CTE

    Ross Tarrant Architects Kentucky
  • Butler County Public Library

    Brandstetter Carrol Inc. Kentucky